How Roko lost Shs 65bn deal to build office block for UBOS
The PPDA Appeals Tribunal has dismissed an application by Roko Construction challenging its disqualification from a multibillion-shilling tender floated by the Uganda Bureau of Statistics (UBOS). In a detailed ruling, the tribunal upheld UBOS’s decision to eliminate Roko at the preliminary stage and confirmed the award to CRJE East Africa Ltd. The dispute arose from … Continue reading How Roko lost Shs 65bn deal to build office block for UBOS
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed